Fibre cut on the Arelion path out of AMS
Rete — transito e peering — AMS
Cronologia
-
Risolto
Full redundancy in AMS restored at 01:30 UTC. Duration of the reduced-redundancy state: 4 h 26 min. No machine lost connectivity at any point; this is what the second carrier is for.
-
In osservazione
The splice is complete and the Arelion link is back at full light level. We are re-enabling it gradually and watching error counters.
-
Causa individuata
Arelion has confirmed a fibre cut caused by third-party roadworks about 9 km from the site. A splice crew has been dispatched. We are operating on the second carrier plus the exchange for the duration, with headroom for peak traffic.
-
In analisi
The Arelion uplink in AMS went down at 21:04 UTC. Traffic failed over to Lumen and NL-ix within seconds; capacity is reduced but no machine is unreachable. Arelion reports a loss of light on the metro fibre.
Gli orari sono mostrati nel fuso orario locale ().
Pagine correlate
- Stato del servizioStato di ogni componente e data center gpuserver.io, sondati ogni 60 secondi da cinque città: disponibilità su 90 giorni e registro incidenti dal 2022.
- Cronologia incidentiOgni incidente e finestra di manutenzione su gpuserver.io dall’inizio del monitoraggio, a settembre 2022, mese per mese, con cronologia e analisi post-incidente.
- Accordo sul livello di servizioL’impegno del 99,9%: cosa conta come downtime, come viene misurato dall’esterno, cinque minuti di durata in più per ogni minuto perso, e le esclusioni per intero.
- RetePorte senza contatore fino a 25 Gbit/s, due carrier e un IX per sede, DDoS sempre filtrato, IPv6 instradato — e quattro cose che non offriamo, dette subito.