全6のデータセンターが正常稼働中

暗号資産で支払い · 本人確認不要 · 5分未満でrootアクセス

軽微 解決済み

Fibre cut on the Arelion path out of AMS

ネットワーク — トランジット・ピアリング — AMS

タイムライン

  1. 解決済み

    Full redundancy in AMS restored at 01:30 UTC. Duration of the reduced-redundancy state: 4 h 26 min. No machine lost connectivity at any point; this is what the second carrier is for.

  2. 監視中

    The splice is complete and the Arelion link is back at full light level. We are re-enabling it gradually and watching error counters.

  3. 原因特定

    Arelion has confirmed a fibre cut caused by third-party roadworks about 9 km from the site. A splice crew has been dispatched. We are operating on the second carrier plus the exchange for the duration, with headroom for peak traffic.

  4. 調査中

    The Arelion uplink in AMS went down at 21:04 UTC. Traffic failed over to Lumen and NL-ix within seconds; capacity is reduced but no machine is unreachable. Arelion reports a loss of light on the metro fibre.

ログイン

コンソール、請求書、アウトオブバンドアクセス。

アカウントをお持ちでないですか?

個別のサインアップはありません。最初の注文を行う際にアカウントが作成されます。支払いのステップでメールアドレスとパスワードを選択していただき、マシンの用意ができる頃にはコンソールも利用可能になっています。

サーバーを設定

Language