Fibre cut on the Arelion path out of AMS

Ağ — transit ve peering — AMS

Zaman çizelgesi

  1. Çözüldü

    Full redundancy in AMS restored at 01:30 UTC. Duration of the reduced-redundancy state: 4 h 26 min. No machine lost connectivity at any point; this is what the second carrier is for.

  2. İzleniyor

    The splice is complete and the Arelion link is back at full light level. We are re-enabling it gradually and watching error counters.

  3. Neden belirlendi

    Arelion has confirmed a fibre cut caused by third-party roadworks about 9 km from the site. A splice crew has been dispatched. We are operating on the second carrier plus the exchange for the duration, with headroom for peak traffic.

  4. İnceleniyor

    The Arelion uplink in AMS went down at 21:04 UTC. Traffic failed over to Lumen and NL-ix within seconds; capacity is reduced but no machine is unreachable. Arelion reports a loss of light on the metro fibre.

Giriş Yapın

Konsol, makbuzlar ve bant dışı erişim.

Henüz hesabınız yok mu?

Ayrı bir kayıt işlemi yoktur. Hesabınız, ilk siparişinizi verirken oluşturulur — e-postayı ve şifreyi ödeme adımında seçersiniz, ve makine hazır olduğunda konsol da açık olur.

Bir sunucu yapılandırın

Language