Fibre cut on the Arelion path out of AMS
Ağ — transit ve peering — AMS
Zaman çizelgesi
-
Çözüldü
Full redundancy in AMS restored at 01:30 UTC. Duration of the reduced-redundancy state: 4 h 26 min. No machine lost connectivity at any point; this is what the second carrier is for.
-
İzleniyor
The splice is complete and the Arelion link is back at full light level. We are re-enabling it gradually and watching error counters.
-
Neden belirlendi
Arelion has confirmed a fibre cut caused by third-party roadworks about 9 km from the site. A splice crew has been dispatched. We are operating on the second carrier plus the exchange for the duration, with headroom for peak traffic.
-
İnceleniyor
The Arelion uplink in AMS went down at 21:04 UTC. Traffic failed over to Lumen and NL-ix within seconds; capacity is reduced but no machine is unreachable. Arelion reports a loss of light on the metro fibre.
Saatler, saat diliminizde () gösterilir.
İlgili sayfalar
- Hizmet durumugpuserver.io'nun her bileşeni ve veri merkezi, beş şehirden 60 saniyede bir yoklanır; 90 günlük kullanılabilirlik ve 2022'den beri olay logu burada yer alır.
- Olay geçmişigpuserver.io'da izlemenin başladığı Eylül 2022'den bu yana yaşanan her olay ve bakım penceresi, ay ay, zaman çizelgesi ve olay sonrası incelemesiyle birlikte.
- Hizmet seviyesi sözleşmesi%99,9 taahhüdü: neyin kesinti sayıldığı, dışarıdan nasıl ölçüldüğü, kaybedilen her dakika için beş dakika süre iadesi ve istisnaların tamamı.
- Ağ25 Gbit/s'e kadar sayaçsız portlar, site başına iki operatör ve bir IX, sürekli DDoS filtreleme, yönlendirilen IPv6 — ve baştan belirtilen, sunmadığımız dört şey.