Fibre cut on the Arelion path out of AMS
Rede — trânsito e peering — AMS
Linha do tempo
-
Resolvido
Full redundancy in AMS restored at 01:30 UTC. Duration of the reduced-redundancy state: 4 h 26 min. No machine lost connectivity at any point; this is what the second carrier is for.
-
Em observação
The splice is complete and the Arelion link is back at full light level. We are re-enabling it gradually and watching error counters.
-
Causa identificada
Arelion has confirmed a fibre cut caused by third-party roadworks about 9 km from the site. A splice crew has been dispatched. We are operating on the second carrier plus the exchange for the duration, with headroom for peak traffic.
-
Investigando
The Arelion uplink in AMS went down at 21:04 UTC. Traffic failed over to Lumen and NL-ix within seconds; capacity is reduced but no machine is unreachable. Arelion reports a loss of light on the metro fibre.
Os horários são mostrados no seu fuso horário ().
Páginas relacionadas
- Status do serviçoStatus de cada componente e centro de dados do gpuserver.io, sondados a cada 60s em cinco cidades, com disponibilidade de 90 dias e log de incidentes desde 2022.
- Histórico de incidentesTodos os incidentes e janelas de manutenção em gpuserver.io desde setembro de 2022, mês a mês, com linha do tempo e revisão pós-incidente.
- Acordo de nível de serviçoO compromisso de 99,9%: o que conta como indisponibilidade, como é medido de fora, cinco minutos de prazo devolvidos por minuto perdido, e as exclusões por completo.
- RedePortas sem contador até 25 Gbit/s, duas operadoras e um IX por site, filtragem DDoS sempre ativa, IPv6 roteado — e as quatro coisas que não oferecemos, já ditas.