Fibre cut on the Arelion path out of AMS
네트워크 — 트랜싯 및 피어링 — AMS
타임라인
-
해결됨
Full redundancy in AMS restored at 01:30 UTC. Duration of the reduced-redundancy state: 4 h 26 min. No machine lost connectivity at any point; this is what the second carrier is for.
-
모니터링 중
The splice is complete and the Arelion link is back at full light level. We are re-enabling it gradually and watching error counters.
-
원인 확인
Arelion has confirmed a fibre cut caused by third-party roadworks about 9 km from the site. A splice crew has been dispatched. We are operating on the second carrier plus the exchange for the duration, with headroom for peak traffic.
-
조사 중
The Arelion uplink in AMS went down at 21:04 UTC. Traffic failed over to Lumen and NL-ix within seconds; capacity is reduced but no machine is unreachable. Arelion reports a loss of light on the metro fibre.
시간은 현지 시간대() 기준으로 표시됩니다.
관련 페이지
- 서비스 상태gpuserver.io의 모든 구성 요소와 데이터센터에 대한 실시간 상태, 다섯 개 도시에서 60초마다 점검, 90일 가동률과 2022년 이후 장애 기록 포함.
- 장애 이력gpuserver.io에서 2022년 9월 모니터링을 시작한 이후 발생한 모든 장애와 점검 시간대, 월별 정리, 각 사건의 타임라인과 사후 검토 포함.
- 서비스 수준 협약99.9% 약정: 무엇이 다운타임인지, 외부에서 어떻게 측정하는지, 손실 1분당 이용 기간 5분을 어떻게 돌려주는지, 그리고 면책 사항 전체.
- 네트워크최대 25 Gbit/s 무제한 포트, 거점마다 회선 사업자 2곳과 IX 1곳, 상시 DDoS 방어, 라우팅된 IPv6 — 그리고 당사가 제공하지 않는 4가지를 먼저 밝힙니다.