Fibre cut on the Arelion path out of AMS
Red — tránsito y peering — AMS
Cronología
-
Resuelto
Full redundancy in AMS restored at 01:30 UTC. Duration of the reduced-redundancy state: 4 h 26 min. No machine lost connectivity at any point; this is what the second carrier is for.
-
En observación
The splice is complete and the Arelion link is back at full light level. We are re-enabling it gradually and watching error counters.
-
Causa identificada
Arelion has confirmed a fibre cut caused by third-party roadworks about 9 km from the site. A splice crew has been dispatched. We are operating on the second carrier plus the exchange for the duration, with headroom for peak traffic.
-
Investigando
The Arelion uplink in AMS went down at 21:04 UTC. Traffic failed over to Lumen and NL-ix within seconds; capacity is reduced but no machine is unreachable. Arelion reports a loss of light on the metro fibre.
Las horas se muestran en su zona horaria ().
Páginas relacionadas
- Estado del servicioEstado en vivo de gpuserver.io: componentes y centros de datos sondeados cada 60 s desde 5 ciudades, con disponibilidad de 90 días e incidentes desde 2022.
- Historial de incidentesTodos los incidentes y ventanas de mantenimiento de gpuserver.io desde septiembre de 2022, mes a mes, con cronología y revisión posterior al incidente.
- Acuerdo de nivel de servicioEl compromiso del 99,9 %: qué cuenta como inactividad, cómo se mide desde fuera, cinco minutos de plazo por cada minuto perdido, y las exclusiones completas.
- RedPuertos sin contador hasta 25 Gbit/s, dos operadores y un IX por sede, filtrado DDoS permanente, IPv6 enrutado — y las cuatro cosas que no ofrecemos, dichas ya.