Core switch line-card failure in ZRH, row C
Rete — transito e peering — ZRH · Gestione fuori banda — ZRH
Cronologia
-
Risolto
Every machine in row C has been reachable since 07:12 UTC. Duration of the outage: 50 minutes. The failed card is being replaced under an existing maintenance window; the replacement does not require another interruption. Affected machines receive the SLA extension automatically.
-
In osservazione
All 13 affected ports are up on the surviving card. We are checking each machine individually before closing this.
-
Causa individuata
A line card in one of the two core switches in ZRH failed. Row C was dual-homed, but the failover on 13 ports did not complete because the standby links were still training. We are forcing those ports over to the surviving card.
-
In analisi
Machines in row C of ZRH lost network connectivity at 06:22 UTC. Rows outside C are unaffected. Engineers are on the floor.
Un’analisi post-incidente viene pubblicata qui entro cinque giorni dalla risoluzione.
Gli orari sono mostrati nel fuso orario locale ().
Pagine correlate
- Stato del servizioStato di ogni componente e data center gpuserver.io, sondati ogni 60 secondi da cinque città: disponibilità su 90 giorni e registro incidenti dal 2022.
- Cronologia incidentiOgni incidente e finestra di manutenzione su gpuserver.io dall’inizio del monitoraggio, a settembre 2022, mese per mese, con cronologia e analisi post-incidente.
- Accordo sul livello di servizioL’impegno del 99,9%: cosa conta come downtime, come viene misurato dall’esterno, cinque minuti di durata in più per ogni minuto perso, e le esclusioni per intero.
- RetePorte senza contatore fino a 25 Gbit/s, due carrier e un IX per sede, DDoS sempre filtrato, IPv6 instradato — e quattro cose che non offriamo, dette subito.