Core switch line-card failure in ZRH, row C
Réseau — transit et peering — ZRH · Gestion hors bande — ZRH
Chronologie
-
Résolu
Every machine in row C has been reachable since 07:12 UTC. Duration of the outage: 50 minutes. The failed card is being replaced under an existing maintenance window; the replacement does not require another interruption. Affected machines receive the SLA extension automatically.
-
Sous surveillance
All 13 affected ports are up on the surviving card. We are checking each machine individually before closing this.
-
Cause identifiée
A line card in one of the two core switches in ZRH failed. Row C was dual-homed, but the failover on 13 ports did not complete because the standby links were still training. We are forcing those ports over to the surviving card.
-
Investigation en cours
Machines in row C of ZRH lost network connectivity at 06:22 UTC. Rows outside C are unaffected. Engineers are on the floor.
Une revue post-incident est publiée ici dans les cinq jours suivant la résolution.
Les heures sont affichées dans votre fuseau horaire ().
Pages liées
- État du serviceÉtat en direct des composants et centres de données gpuserver.io, sondés toutes les 60 s depuis cinq villes : disponibilité sur 90 jours et incidents depuis 2022.
- Historique des incidentsChaque incident et fenêtre de maintenance sur gpuserver.io depuis septembre 2022, mois par mois, avec chronologie et revue post-incident.
- Accord de niveau de serviceL’engagement de 99,9 % : la définition d’une panne, la mesure externe, cinq minutes de durée d’engagement rendues par minute perdue, et les exclusions en détail.
- RéseauPorts sans compteur jusqu’à 25 Gbit/s, deux opérateurs et un IX par site, filtrage DDoS permanent, IPv6 routé — et quatre choses que nous n’offrons pas, en clair.