Core switch line-card failure in REY, row B
Réseau — transit et peering — REY · Gestion hors bande — REY
Chronologie
-
Résolu
Every machine in row B has been reachable since 22:22 UTC. Duration of the outage: 54 minutes. The failed card is being replaced under an existing maintenance window; the replacement does not require another interruption. Affected machines receive the SLA extension automatically.
-
Sous surveillance
All 14 affected ports are up on the surviving card. We are checking each machine individually before closing this.
-
Cause identifiée
A line card in one of the two core switches in REY failed. Row B was dual-homed, but the failover on 14 ports did not complete because the standby links were still training. We are forcing those ports over to the surviving card.
-
Investigation en cours
Machines in row B of REY lost network connectivity at 21:28 UTC. Rows outside B are unaffected. Engineers are on the floor.
Une revue post-incident est publiée ici dans les cinq jours suivant la résolution.
Les heures sont affichées dans votre fuseau horaire ().
Pages liées
- État du serviceÉtat en direct des composants et centres de données gpuserver.io, sondés toutes les 60 s depuis cinq villes : disponibilité sur 90 jours et incidents depuis 2022.
- Historique des incidentsChaque incident et fenêtre de maintenance sur gpuserver.io depuis septembre 2022, mois par mois, avec chronologie et revue post-incident.
- Accord de niveau de serviceL’engagement de 99,9 % : la définition d’une panne, la mesure externe, cinq minutes de durée d’engagement rendues par minute perdue, et les exclusions en détail.
- RéseauPorts sans compteur jusqu’à 25 Gbit/s, deux opérateurs et un IX par site, filtrage DDoS permanent, IPv6 routé — et quatre choses que nous n’offrons pas, en clair.