Cooling alarm in YUL, row D; some nodes thermally throttled
电力与散热——YUL
时间线
-
已解决
Row D is back at target temperature and no GPU is throttling. Duration: 36 minutes. Affected workloads ran slower during the event but were not interrupted.
-
观察中
The tripped unit is back in service and inlet temperatures are falling. GPU clocks are returning to normal.
-
已确定原因
One of the two CRAC units serving row D tripped on a pressure alarm. The remaining unit is holding the row a few degrees above target. The facility has an engineer on the unit.
-
调查中
Inlet temperatures in row D of YUL rose above the alert threshold at 20:12 UTC. GPUs on 17 machines in that row have reduced their clocks to stay within limits. Machines remain reachable and workloads continue at lower performance.