Cooling alarm in YUL, row D; some nodes thermally throttled

Güç ve soğutma — YUL

Zaman çizelgesi

  1. Çözüldü

    Row D is back at target temperature and no GPU is throttling. Duration: 36 minutes. Affected workloads ran slower during the event but were not interrupted.

  2. İzleniyor

    The tripped unit is back in service and inlet temperatures are falling. GPU clocks are returning to normal.

  3. Neden belirlendi

    One of the two CRAC units serving row D tripped on a pressure alarm. The remaining unit is holding the row a few degrees above target. The facility has an engineer on the unit.

  4. İnceleniyor

    Inlet temperatures in row D of YUL rose above the alert threshold at 20:12 UTC. GPUs on 17 machines in that row have reduced their clocks to stay within limits. Machines remain reachable and workloads continue at lower performance.

Giriş Yapın

Konsol, makbuzlar ve bant dışı erişim.

Henüz hesabınız yok mu?

Ayrı bir kayıt işlemi yoktur. Hesabınız, ilk siparişinizi verirken oluşturulur — e-postayı ve şifreyi ödeme adımında seçersiniz, ve makine hazır olduğunda konsol da açık olur.

Bir sunucu yapılandırın

Language