Utility power event in YUL; site running on generator
电力与散热——YUL
时间线
-
已解决
YUL is back on utility power with the UPS fully recharged. Duration on generator: 49 minutes. No machine lost power at any point; the site simply ran on the second source it has for this reason.
-
观察中
Utility power has been restored and the facility is running the transfer back. We are watching for any disturbance on the way back.
-
已确定原因
The facility reports a fault on the utility feed. Generators have fuel for far longer than the expected repair time and are being refuelled as a precaution.
-
调查中
The facility in YUL lost utility power at 22:14 UTC. The UPS carried the load and the generators picked it up within seconds. No machine noticed. We are posting this because the site is on reduced redundancy while on generator.