Facility generator and transfer-switch test — ZRH
电力与散热——ZRH
计划安排
The facility runs its periodic test of the generators and automatic transfer switches in ZRH. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.
时间线
-
已完成
Test complete. ZRH is back on utility power; both transfers were clean.
-
进行中
The test is under way. ZRH is on generator; the UPS carried the transfer with no disturbance.
-
已排期
The facility runs its periodic test of the generators and automatic transfer switches in ZRH. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.
时间以您所在时区()显示。