Facility generator and transfer-switch test — ZRH
Alimentación y refrigeración — ZRH
Qué está previsto
The facility runs its periodic test of the generators and automatic transfer switches in ZRH. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.
Cronología
-
Completado
Test complete. ZRH is back on utility power; both transfers were clean.
-
En curso
The test is under way. ZRH is on generator; the UPS carried the transfer with no disturbance.
-
Programado
The facility runs its periodic test of the generators and automatic transfer switches in ZRH. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.
Las horas se muestran en su zona horaria ().
Páginas relacionadas
- Estado del servicioEstado en vivo de gpuserver.io: componentes y centros de datos sondeados cada 60 s desde 5 ciudades, con disponibilidad de 90 días e incidentes desde 2022.
- Historial de incidentesTodos los incidentes y ventanas de mantenimiento de gpuserver.io desde septiembre de 2022, mes a mes, con cronología y revisión posterior al incidente.
- Acuerdo de nivel de servicioEl compromiso del 99,9 %: qué cuenta como inactividad, cómo se mide desde fuera, cinco minutos de plazo por cada minuto perdido, y las exclusiones completas.
- RedPuertos sin contador hasta 25 Gbit/s, dos operadores y un IX por sede, filtrado DDoS permanente, IPv6 enrutado — y las cuatro cosas que no ofrecemos, dichas ya.