Manutenção Concluída

Facility generator and transfer-switch test — STO

Energia e refrigeração — STO

O que está planejado

The facility runs its periodic test of the generators and automatic transfer switches in STO. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.

Linha do tempo

  1. Concluída

    Test complete. STO is back on utility power; both transfers were clean.

  2. Em andamento

    The test is under way. STO is on generator; the UPS carried the transfer with no disturbance.

  3. Agendada

    The facility runs its periodic test of the generators and automatic transfer switches in STO. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.

Entrar

Console, faturas e acesso fora de banda.

Ainda não tem uma conta?

Não existe cadastro separado. Sua conta é criada enquanto você faz seu primeiro pedido — você escolhe o e-mail e a senha na etapa de pagamento, e o console já está aberto quando a máquina estiver pronta.

Configurar um servidor

Language