Maintenance Terminée

Annual cooling system service — ZRH

Alimentation et refroidissement — ZRH

Ce qui est prévu

The facility services the cooling plant in ZRH: filters, refrigerant levels, pump inspection. Units are serviced one at a time; the room stays within its temperature envelope on the remaining units. GPU clocks are not expected to change. We monitor inlet temperatures throughout and will pause the work if any row exceeds target.

Chronologie

  1. Terminée

    All units serviced. Inlet temperatures stayed within 2 °C of target throughout.

  2. En cours

    Service has started on the first cooling unit. Inlet temperatures are at target.

  3. Planifiée

    The facility services the cooling plant in ZRH: filters, refrigerant levels, pump inspection. Units are serviced one at a time; the room stays within its temperature envelope on the remaining units. GPU clocks are not expected to change. We monitor inlet temperatures throughout and will pause the work if any row exceeds target.

Se connecter

Console, factures et accès hors bande.

Pas encore de compte ?

Il n’y a pas d’inscription séparée. Votre compte est créé au moment où vous passez votre première commande — vous choisissez l’e-mail et le mot de passe à l’étape de paiement, et la console est ouverte au moment où la machine l’est.

Configurer un serveur

Language