Planned works by Init7 — ZRH
Сеть — транзит и пиринг — ZRH
Что запланировано
Init7 has announced maintenance on the circuit that serves ZRH. We will shut our session with them before the window and bring it back after, so that traffic stays on Cogent and SwissIX throughout. No customer impact is expected; the site runs on reduced redundancy for the duration.
Хронология
-
Завершено
Init7 has finished. The session is back up and ZRH is on full redundancy again. Nothing was affected.
-
Выполняется
The Init7 session in ZRH has been shut for the announced works. Traffic is on Cogent and SwissIX.
-
Запланировано
Init7 has announced maintenance on the circuit that serves ZRH. We will shut our session with them before the window and bring it back after, so that traffic stays on Cogent and SwissIX throughout. No customer impact is expected; the site runs on reduced redundancy for the duration.
Время показано в вашем часовом поясе ().
Похожие страницы
- Статус сервисаТекущий статус компонентов и дата-центров gpuserver.io: проверка каждые 60 секунд из пяти городов, доступность за 90 дней и журнал инцидентов с 2022 года.
- История инцидентовКаждый инцидент и окно обслуживания на gpuserver.io с начала мониторинга в сентябре 2022 года, по месяцам, с хронологией и разбором инцидента.
- Соглашение об уровне обслуживанияОбязательство 99,9 %: что считается простоем, как это измеряется извне, пять минут срока за минуту потерь и полный список исключений.
- СетьБезлимитные порты до 25 Gbit/s, два оператора и IX на площадке, постоянная фильтрация DDoS, маршрутизируемый IPv6 — и четыре вещи, которые мы прямо не предлагаем.