Top-of-rack switch firmware, rows D–E — AMS

Сеть — транзит и пиринг — AMS

Что запланировано

The top-of-rack switches in rows D to E of AMS receive a firmware update. Each switch reloads once, which interrupts the network for the machines in its rack for about 90 seconds. Racks are done one at a time. Running workloads are not affected, only reachability during the reload. The interruption is counted against the SLA of the affected machines even though it is announced.

Хронология

  1. Завершено

    All switches in rows D–E of AMS are on the new firmware. Each rack was interrupted once, for under two minutes.

  2. Выполняется

    Maintenance has started with row D. Each rack will see about 90 seconds of interruption when its switch reloads.

  3. Запланировано

    The top-of-rack switches in rows D to E of AMS receive a firmware update. Each switch reloads once, which interrupts the network for the machines in its rack for about 90 seconds. Racks are done one at a time. Running workloads are not affected, only reachability during the reload. The interruption is counted against the SLA of the affected machines even though it is announced.