Facility generator and transfer-switch test — YUL

전력 및 냉각 — YUL

예정된 작업

The facility runs its periodic test of the generators and automatic transfer switches in YUL. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.

타임라인

  1. 완료됨

    Test complete. YUL is back on utility power; both transfers were clean.

  2. 진행 중

    The test is under way. YUL is on generator; the UPS carried the transfer with no disturbance.

  3. 예정됨

    The facility runs its periodic test of the generators and automatic transfer switches in YUL. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.

로그인

콘솔, 청구서, 대역 외 접근.

계정이 없으십니까?

별도의 회원가입은 없습니다. 첫 주문을 진행하는 동안 계정이 만들어집니다 — 결제 단계에서 이메일과 비밀번호를 직접 정하시고, 머신이 준비될 때쯤이면 콘솔도 이미 열려 있습니다.

서버 구성하기

Language