UPS battery replacement — ZRH
電源・冷却 — ZRH
予定内容
The facility replaces the battery strings in one UPS module in ZRH. The module is taken out of the parallel set for the work; the remaining modules carry the full load with redundancy reduced by one. No machine loses power. Scheduled during the day so that the facility's electrical team is fully staffed.
タイムライン
-
完了
The module is back in the set with new batteries and has completed its charge test.
-
実施中
The UPS module is out of the set and the batteries are being swapped. All machines are on the remaining modules.
-
予定
The facility replaces the battery strings in one UPS module in ZRH. The module is taken out of the parallel set for the work; the remaining modules carry the full load with redundancy reduced by one. No machine loses power. Scheduled during the day so that the facility's electrical team is fully staffed.
時刻はお使いのタイムゾーン()で表示されます。
関連ページ
- サービスステータスgpuserver.ioの全コンポーネントと全データセンターのライブステータス。5都市から60秒ごとに監視プローブで測定し、90日間の稼働率と2022年以降のインシデントログを掲載。
- インシデント履歴gpuserver.ioで2022年9月の監視開始以降に発生した、すべてのインシデントとメンテナンス時間帯を月別に掲載。タイムラインと事後レビューも収録しています。
- サービスレベル契約稼働率99.9%の約束:何がダウンタイムとみなされるか、外部からどう測定するか、失った1分につき契約期間を5分延長する仕組み、そして適用除外の全内容。
- ネットワーク最大25Gbit/sの無制限ポート、拠点ごとに2つのキャリアと1つのIX、常時稼働のDDoSフィルタリング、ルーテッドIPv6。そして、提供しない4つのことを最初に明示します。