Maintenance Terminée

Top-of-rack switch firmware, rows A–B — ZRH

Réseau — transit et peering — ZRH

Ce qui est prévu

The top-of-rack switches in rows A to B of ZRH receive a firmware update. Each switch reloads once, which interrupts the network for the machines in its rack for about 90 seconds. Racks are done one at a time. Running workloads are not affected, only reachability during the reload. The interruption is counted against the SLA of the affected machines even though it is announced.

Chronologie

  1. Terminée

    All switches in rows A–B of ZRH are on the new firmware. Each rack was interrupted once, for under two minutes.

  2. En cours

    We need about 16 more minutes than announced. The work is proceeding normally; the window is extended by that amount.

  3. En cours

    Maintenance has started with row A. Each rack will see about 90 seconds of interruption when its switch reloads.

  4. Planifiée

    The top-of-rack switches in rows A to B of ZRH receive a firmware update. Each switch reloads once, which interrupts the network for the machines in its rack for about 90 seconds. Racks are done one at a time. Running workloads are not affected, only reachability during the reload. The interruption is counted against the SLA of the affected machines even though it is announced.

Se connecter

Console, factures et accès hors bande.

Pas encore de compte ?

Il n’y a pas d’inscription séparée. Votre compte est créé au moment où vous passez votre première commande — vous choisissez l’e-mail et le mot de passe à l’étape de paiement, et la console est ouverte au moment où la machine l’est.

Configurer un serveur

Language