UPS battery replacement — YUL
Güç ve soğutma — YUL
Ne planlanıyor
The facility replaces the battery strings in one UPS module in YUL. The module is taken out of the parallel set for the work; the remaining modules carry the full load with redundancy reduced by one. No machine loses power. Scheduled during the day so that the facility's electrical team is fully staffed.
Zaman çizelgesi
-
Tamamlandı
The module is back in the set with new batteries and has completed its charge test.
-
Sürüyor
The UPS module is out of the set and the batteries are being swapped. All machines are on the remaining modules.
-
Planlandı
The facility replaces the battery strings in one UPS module in YUL. The module is taken out of the parallel set for the work; the remaining modules carry the full load with redundancy reduced by one. No machine loses power. Scheduled during the day so that the facility's electrical team is fully staffed.
Saatler, saat diliminizde () gösterilir.
İlgili sayfalar
- Hizmet durumugpuserver.io'nun her bileşeni ve veri merkezi, beş şehirden 60 saniyede bir yoklanır; 90 günlük kullanılabilirlik ve 2022'den beri olay logu burada yer alır.
- Olay geçmişigpuserver.io'da izlemenin başladığı Eylül 2022'den bu yana yaşanan her olay ve bakım penceresi, ay ay, zaman çizelgesi ve olay sonrası incelemesiyle birlikte.
- Hizmet seviyesi sözleşmesi%99,9 taahhüdü: neyin kesinti sayıldığı, dışarıdan nasıl ölçüldüğü, kaybedilen her dakika için beş dakika süre iadesi ve istisnaların tamamı.
- Ağ25 Gbit/s'e kadar sayaçsız portlar, site başına iki operatör ve bir IX, sürekli DDoS filtreleme, yönlendirilen IPv6 — ve baştan belirtilen, sunmadığımız dört şey.