UPS battery replacement — STO
Power & cooling — STO
What is planned
The facility replaces the battery strings in one UPS module in STO. The module is taken out of the parallel set for the work; the remaining modules carry the full load with redundancy reduced by one. No machine loses power. Scheduled during the day so that the facility's electrical team is fully staffed.
Timeline
-
Completed
The module is back in the set with new batteries and has completed its charge test.
-
In progress
The UPS module is out of the set and the batteries are being swapped. All machines are on the remaining modules.
-
Scheduled
The facility replaces the battery strings in one UPS module in STO. The module is taken out of the parallel set for the work; the remaining modules carry the full load with redundancy reduced by one. No machine loses power. Scheduled during the day so that the facility's electrical team is fully staffed.
Times are shown in your time zone ().
Related pages
- Service statusLive status of every gpuserver.io component and data centre, probed every 60 seconds from five cities, with 90-day uptime and the incident log since 2022.
- Incident historyEvery incident and maintenance window on gpuserver.io since monitoring began in September 2022, month by month, with its timeline and post-incident review.
- Service level agreementThe 99.9% commitment: what counts as downtime, how it is measured from outside, five minutes of term back per minute lost, and the exclusions in full.
- NetworkUnmetered ports up to 25 Gbit/s, two carriers and an IX per site, always-on DDoS filtering, routed IPv6 — and the four things we do not offer, stated up front.