UPS battery replacement — STO
Alimentación y refrigeración — STO
Qué está previsto
The facility replaces the battery strings in one UPS module in STO. The module is taken out of the parallel set for the work; the remaining modules carry the full load with redundancy reduced by one. No machine loses power. Scheduled during the day so that the facility's electrical team is fully staffed.
Cronología
-
Completado
The module is back in the set with new batteries and has completed its charge test.
-
En curso
The UPS module is out of the set and the batteries are being swapped. All machines are on the remaining modules.
-
Programado
The facility replaces the battery strings in one UPS module in STO. The module is taken out of the parallel set for the work; the remaining modules carry the full load with redundancy reduced by one. No machine loses power. Scheduled during the day so that the facility's electrical team is fully staffed.
Las horas se muestran en su zona horaria ().
Páginas relacionadas
- Estado del servicioEstado en vivo de gpuserver.io: componentes y centros de datos sondeados cada 60 s desde 5 ciudades, con disponibilidad de 90 días e incidentes desde 2022.
- Historial de incidentesTodos los incidentes y ventanas de mantenimiento de gpuserver.io desde septiembre de 2022, mes a mes, con cronología y revisión posterior al incidente.
- Acuerdo de nivel de servicioEl compromiso del 99,9 %: qué cuenta como inactividad, cómo se mide desde fuera, cinco minutos de plazo por cada minuto perdido, y las exclusiones completas.
- RedPuertos sin contador hasta 25 Gbit/s, dos operadores y un IX por sede, filtrado DDoS permanente, IPv6 enrutado — y las cuatro cosas que no ofrecemos, dichas ya.