Elevated inlet temperature in STO, row A
Power & cooling — STO
Timeline
-
Resolved
Row A is back at target. Duration: 22 minutes. No machine throttled and nothing was interrupted.
-
Identified
A blanking panel was removed during a machine swap and not replaced, letting hot exhaust recirculate to the neighbouring rack. It has been put back.
-
Investigating
Inlet temperatures in row A of STO are 4–6 °C above target since 11:01 UTC. No GPU has throttled yet. We are looking for the cause with the facility.
Times are shown in your time zone ().
Related pages
- Service statusLive status of every gpuserver.io component and data centre, probed every 60 seconds from five cities, with 90-day uptime and the incident log since 2022.
- Incident historyEvery incident and maintenance window on gpuserver.io since monitoring began in September 2022, month by month, with its timeline and post-incident review.
- Service level agreementThe 99.9% commitment: what counts as downtime, how it is measured from outside, five minutes of term back per minute lost, and the exclusions in full.
- NetworkUnmetered ports up to 25 Gbit/s, two carriers and an IX per site, always-on DDoS filtering, routed IPv6 — and the four things we do not offer, stated up front.