Facility generator and transfer-switch test — AMS
Energia e refrigeração — AMS
O que está planejado
The facility runs its periodic test of the generators and automatic transfer switches in AMS. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.
Linha do tempo
-
Concluída
Test complete. AMS is back on utility power; both transfers were clean.
-
Em andamento
We need about 25 more minutes than announced. The work is proceeding normally; the window is extended by that amount.
-
Em andamento
The test is under way. AMS is on generator; the UPS carried the transfer with no disturbance.
-
Agendada
The facility runs its periodic test of the generators and automatic transfer switches in AMS. The site is transferred to generator and back under load. The UPS covers the transfers; machines do not notice. We post it because the site is on a single source for a few minutes during each transfer.
Os horários são mostrados no seu fuso horário ().
Páginas relacionadas
- Status do serviçoStatus de cada componente e centro de dados do gpuserver.io, sondados a cada 60s em cinco cidades, com disponibilidade de 90 dias e log de incidentes desde 2022.
- Histórico de incidentesTodos os incidentes e janelas de manutenção em gpuserver.io desde setembro de 2022, mês a mês, com linha do tempo e revisão pós-incidente.
- Acordo de nível de serviçoO compromisso de 99,9%: o que conta como indisponibilidade, como é medido de fora, cinco minutos de prazo devolvidos por minuto perdido, e as exclusões por completo.
- RedePortas sem contador até 25 Gbit/s, duas operadoras e um IX por site, filtragem DDoS sempre ativa, IPv6 roteado — e as quatro coisas que não oferecemos, já ditas.