Planned works by Arelion — AMS
Rede — trânsito e peering — AMS
O que está planejado
Arelion has announced maintenance on the circuit that serves AMS. We will shut our session with them before the window and bring it back after, so that traffic stays on Lumen and AMS-IX throughout. No customer impact is expected; the site runs on reduced redundancy for the duration.
Linha do tempo
-
Concluída
Arelion has finished. The session is back up and AMS is on full redundancy again. Nothing was affected.
-
Em andamento
We need about 32 more minutes than announced. The work is proceeding normally; the window is extended by that amount.
-
Em andamento
The Arelion session in AMS has been shut for the announced works. Traffic is on Lumen and AMS-IX.
-
Agendada
Arelion has announced maintenance on the circuit that serves AMS. We will shut our session with them before the window and bring it back after, so that traffic stays on Lumen and AMS-IX throughout. No customer impact is expected; the site runs on reduced redundancy for the duration.
Os horários são mostrados no seu fuso horário ().
Páginas relacionadas
- Status do serviçoStatus de cada componente e centro de dados do gpuserver.io, sondados a cada 60s em cinco cidades, com disponibilidade de 90 dias e log de incidentes desde 2022.
- Histórico de incidentesTodos os incidentes e janelas de manutenção em gpuserver.io desde setembro de 2022, mês a mês, com linha do tempo e revisão pós-incidente.
- Acordo de nível de serviçoO compromisso de 99,9%: o que conta como indisponibilidade, como é medido de fora, cinco minutos de prazo devolvidos por minuto perdido, e as exclusões por completo.
- RedePortas sem contador até 25 Gbit/s, duas operadoras e um IX por site, filtragem DDoS sempre ativa, IPv6 roteado — e as quatro coisas que não oferecemos, já ditas.