Top-of-rack switch firmware, rows E–D — AMS
Ağ — transit ve peering — AMS
Ne planlanıyor
The top-of-rack switches in rows E to D of AMS receive a firmware update. Each switch reloads once, which interrupts the network for the machines in its rack for about 90 seconds. Racks are done one at a time. Running workloads are not affected, only reachability during the reload. The interruption is counted against the SLA of the affected machines even though it is announced.
Zaman çizelgesi
-
Tamamlandı
All switches in rows E–D of AMS are on the new firmware. Each rack was interrupted once, for under two minutes.
-
Sürüyor
Maintenance has started with row E. Each rack will see about 90 seconds of interruption when its switch reloads.
-
Planlandı
The top-of-rack switches in rows E to D of AMS receive a firmware update. Each switch reloads once, which interrupts the network for the machines in its rack for about 90 seconds. Racks are done one at a time. Running workloads are not affected, only reachability during the reload. The interruption is counted against the SLA of the affected machines even though it is announced.
Saatler, saat diliminizde () gösterilir.
İlgili sayfalar
- Hizmet durumugpuserver.io'nun her bileşeni ve veri merkezi, beş şehirden 60 saniyede bir yoklanır; 90 günlük kullanılabilirlik ve 2022'den beri olay logu burada yer alır.
- Olay geçmişigpuserver.io'da izlemenin başladığı Eylül 2022'den bu yana yaşanan her olay ve bakım penceresi, ay ay, zaman çizelgesi ve olay sonrası incelemesiyle birlikte.
- Hizmet seviyesi sözleşmesi%99,9 taahhüdü: neyin kesinti sayıldığı, dışarıdan nasıl ölçüldüğü, kaybedilen her dakika için beş dakika süre iadesi ve istisnaların tamamı.
- Ağ25 Gbit/s'e kadar sayaçsız portlar, site başına iki operatör ve bir IX, sürekli DDoS filtreleme, yönlendirilen IPv6 — ve baştan belirtilen, sunmadığımız dört şey.