Planned works by Arelion — STO
Network — transit & peering — STO
What is planned
Arelion has announced maintenance on the circuit that serves STO. We will shut our session with them before the window and bring it back after, so that traffic stays on GlobalConnect and STHIX throughout. No customer impact is expected; the site runs on reduced redundancy for the duration.
Timeline
-
Completed
Arelion has finished. The session is back up and STO is on full redundancy again. Nothing was affected.
-
In progress
The Arelion session in STO has been shut for the announced works. Traffic is on GlobalConnect and STHIX.
-
Scheduled
Arelion has announced maintenance on the circuit that serves STO. We will shut our session with them before the window and bring it back after, so that traffic stays on GlobalConnect and STHIX throughout. No customer impact is expected; the site runs on reduced redundancy for the duration.
Times are shown in your time zone ().
Related pages
- Service statusLive status of every gpuserver.io component and data centre, probed every 60 seconds from five cities, with 90-day uptime and the incident log since 2022.
- Incident historyEvery incident and maintenance window on gpuserver.io since monitoring began in September 2022, month by month, with its timeline and post-incident review.
- Service level agreementThe 99.9% commitment: what counts as downtime, how it is measured from outside, five minutes of term back per minute lost, and the exclusions in full.
- NetworkUnmetered ports up to 25 Gbit/s, two carriers and an IX per site, always-on DDoS filtering, routed IPv6 — and the four things we do not offer, stated up front.