Top-of-rack switch firmware, rows B–C — ZRH
Netzwerk — Transit & Peering — ZRH
Was geplant ist
The top-of-rack switches in rows B to C of ZRH receive a firmware update. Each switch reloads once, which interrupts the network for the machines in its rack for about 90 seconds. Racks are done one at a time. Running workloads are not affected, only reachability during the reload. The interruption is counted against the SLA of the affected machines even though it is announced.
Zeitleiste
-
Abgeschlossen
All switches in rows B–C of ZRH are on the new firmware. Each rack was interrupted once, for under two minutes.
-
Läuft
Maintenance has started with row B. Each rack will see about 90 seconds of interruption when its switch reloads.
-
Geplant
The top-of-rack switches in rows B to C of ZRH receive a firmware update. Each switch reloads once, which interrupts the network for the machines in its rack for about 90 seconds. Racks are done one at a time. Running workloads are not affected, only reachability during the reload. The interruption is counted against the SLA of the affected machines even though it is announced.
Zeiten werden in Ihrer Zeitzone angezeigt ().
Verwandte Seiten
- ServicestatusLive-Status jeder gpuserver.io-Komponente und jedes Rechenzentrums, alle 60 Sekunden aus fünf Städten gemessen, mit 90-Tage-Verfügbarkeit und Protokoll seit 2022.
- VorfallshistorieJeder Vorfall und jedes Wartungsfenster auf gpuserver.io seit September 2022, mit Zeitleiste und Nachbesprechung des Vorfalls.
- Vereinbarung zum ServicelevelDie 99,9-%-Zusage: was als Ausfallzeit zählt, wie sie von außen gemessen wird, fünf Minuten Laufzeit zurück je verlorener Minute, und die Ausschlüsse vollständig.
- NetzwerkPorts ohne Volumenbegrenzung bis 25 Gbit/s, zwei Carrier und ein IX pro Standort, ständige DDoS-Filterung, geroutetes IPv6 — und vier Dinge, die wir nicht anbieten.